Home / Blog Center / How to integrate DocuSign with Buildertrend for change orders?

How to integrate DocuSign with Buildertrend for change orders?

Shunfang
2026-01-30
3min
Twitter Facebook Linkedin

Introduction to Streamlining Construction Workflows

In the construction industry, managing change orders efficiently is crucial for maintaining project timelines, budgets, and client satisfaction. Change orders often involve detailed documentation, approvals, and signatures from multiple stakeholders, which can lead to delays if handled manually. Integrating DocuSign, a leading electronic signature platform, with Buildertrend, a popular construction project management software, offers a seamless way to automate this process. This integration allows users to generate, send, and track change orders directly within Buildertrend, reducing paperwork and errors.

image

By leveraging APIs and native connectors, teams can embed DocuSign’s eSignature capabilities into Buildertrend’s workflows, ensuring compliance and auditability. This approach is particularly valuable for mid-sized construction firms dealing with frequent modifications to project scopes.


Comparing eSignature platforms with DocuSign or Adobe Sign?

eSignGlobal delivers a more flexible and cost-effective eSignature solution with global compliance, transparent pricing, and faster onboarding.

👉 Start Free Trial


Understanding Change Orders in Construction

Change orders represent modifications to the original contract, such as scope expansions, material substitutions, or schedule adjustments. In Buildertrend, these are typically created via the Change Order module, where users input details like costs, descriptions, and attachments. However, obtaining signatures from clients, subcontractors, and internal approvers often requires exporting documents to external tools, creating silos.

DocuSign’s integration addresses this by enabling electronic signatures compliant with standards like ESIGN and UETA in the US, or eIDAS in the EU. For global operations, it’s essential to verify regional laws, but the focus here is on practical US-based construction scenarios where such integrations shine.

Step-by-Step Guide to Integrating DocuSign with Buildertrend for Change Orders

Integrating DocuSign with Buildertrend requires a DocuSign account (Standard or higher plan recommended for API access) and Buildertrend’s premium features. The process leverages Buildertrend’s built-in DocuSign integration or Zapier for custom setups. Here’s a detailed walkthrough:

Step 1: Set Up Accounts and Permissions

  • DocuSign Setup: Log into your DocuSign account and navigate to the Admin panel. Ensure you have an active eSignature plan (e.g., Business Pro at $40/user/month annually). Enable API access under “Connect” > “API Integrations.” Generate an API token or use OAuth for secure authentication. If using advanced features like Identity and Access Management (IAM), configure SSO for team-wide access—DocuSign IAM provides centralized user management, role-based permissions, and audit trails, ideal for construction firms with multiple projects.
  • Buildertrend Setup: In Buildertrend, go to Settings > Integrations. Confirm your subscription includes the Change Order tool (available in Pro plans). Assign admin rights to users who will manage integrations.

This foundational step typically takes 15-30 minutes and ensures secure data flow.

Step 2: Configure the Native Integration

Buildertrend offers a direct DocuSign connector for change orders:

  • In Buildertrend, create a new Change Order via the Projects dashboard. Fill in details: scope, cost impact, and attachments (e.g., blueprints).
  • Select “Send for Signature” and choose DocuSign as the provider. If not pre-configured, link accounts by entering your DocuSign API key from Step 1.
  • Map fields: Buildertrend auto-populates signer roles (e.g., client as primary signer, PM as approver). Add custom fields like approval deadlines.
  • DocuSign will generate an envelope from the change order PDF, embedding signature fields dynamically.

For teams with high volumes, enable Bulk Send in DocuSign Business Pro to handle multiple change orders at once, though quotas apply (around 100 envelopes/user/year).

Step 3: Automate Workflow with Zapier or API

For deeper customization:

  • Use Zapier (free tier for basics, $20/month for advanced): Create a “Zap” triggered by a new Change Order in Buildertrend. Action: Create DocuSign envelope, add signers from Buildertrend contacts, and route back completed docs to Buildertrend’s Daily Logs or Files section.
  • Direct API Integration: If your team has developers, use DocuSign’s REST API (Starter plan at $600/year for 40 envelopes/month). In Buildertrend’s API docs, hook into the Change Order endpoint. Sample code (Node.js):
    const dsApi = require('docusign-esign');
    // Authenticate and create envelope from Buildertrend data
    let env = new dsApi.EnvelopeDefinition();
    env.emailSubject = 'Change Order Approval';
    // Attach Buildertrend PDF and set signers
    
    Test in DocuSign’s Developer Sandbox to avoid live envelope charges.

This automation cuts approval times from days to hours, with real-time notifications in Buildertrend.

Step 4: Test and Go Live

  • Create a test change order in Buildertrend for a sample project. Send via DocuSign and simulate signatures.
  • Monitor via DocuSign’s audit logs and Buildertrend’s activity feed. Verify compliance—DocuSign timestamps and certificates ensure legal validity.
  • Train your team: Buildertrend’s help center has tutorials; DocuSign offers webinars. Common pitfalls include envelope quotas—upgrade to Advanced API ($5,760/year) for unlimited bulk sends if needed.

Step 5: Optimize and Scale

Post-integration, use DocuSign templates for recurring change order formats to speed up creation. Integrate add-ons like SMS delivery ($0.50/message) for on-site approvals. For enterprise-scale, DocuSign’s CLM (Contract Lifecycle Management) add-on manages full contract repos, linking change orders to master agreements.

This integration process, spanning setup to optimization, empowers construction teams to handle 20-50% more change orders monthly without added headcount.

Benefits of DocuSign-Buildertrend Integration

From a business perspective, this pairing reduces administrative overhead by 40-60%, per industry reports. It minimizes disputes through tamper-evident signatures and integrates seamlessly with Buildertrend’s scheduling tools, preventing scope creep. ROI is quick: A mid-sized firm might save $10,000 annually in printing and courier costs alone. However, costs scale with usage—DocuSign’s per-envelope model can add up for high-volume projects.

Comparing eSignature Solutions for Construction Integrations

When evaluating eSignature tools for Buildertrend, consider factors like API flexibility, pricing, and compliance. DocuSign leads in native integrations but faces competition from alternatives offering similar capabilities at varying costs.

DocuSign Overview

DocuSign is a robust platform with strong API support for tools like Buildertrend. Its eSignature plans start at $10/month for Personal, scaling to $40/user/month for Business Pro, including bulk sends and payments. Advanced features like IAM enhance security for multi-user environments.

image

Adobe Sign Overview

Adobe Sign, part of Adobe Document Cloud, excels in PDF-heavy workflows common in construction. It integrates via APIs or Zapier with Buildertrend, supporting change order signing with Acrobat’s editing tools. Pricing begins at $10/user/month for individuals, up to $40/user/month for teams, with strong emphasis on enterprise compliance and mobile signing.

image

eSignGlobal Overview

eSignGlobal positions itself as a global contender, compliant in 100 mainstream countries and regions. It holds advantages in the Asia-Pacific (APAC), where electronic signatures face fragmentation, high standards, and strict regulations. Unlike the framework-based ESIGN/eIDAS in the West, APAC standards emphasize “ecosystem-integrated” approaches, requiring deep hardware/API integrations with government digital identities (G2B). eSignGlobal excels here, seamlessly connecting with Hong Kong’s iAM Smart and Singapore’s Singpass, surpassing email-based verification common in the US/EU. Its Essential plan at $299/year ($16.6/month equivalent) allows 100 documents, unlimited user seats, and access code verification—offering high value on compliance without per-seat fees. This makes it cost-competitive for global construction firms expanding into APAC.

esignglobal HK


Looking for a smarter alternative to DocuSign?

eSignGlobal delivers a more flexible and cost-effective eSignature solution with global compliance, transparent pricing, and faster onboarding.

👉 Start Free Trial


HelloSign (Dropbox Sign) Overview

HelloSign, now Dropbox Sign, focuses on simplicity with unlimited templates in its $15/user/month Essentials plan. It supports Buildertrend via Zapier but lacks native bulk sends, suiting smaller teams over complex construction needs.

Feature DocuSign Adobe Sign eSignGlobal HelloSign (Dropbox Sign)
Pricing (Entry Level, Annual) $120/user/year (Personal) $120/user/year (Individual) $299/year (Essential, Unlimited Users) $180/user/year (Essentials)
API Integration Ease Excellent (Native + REST API) Good (Adobe APIs) Strong (Included in Pro) Moderate (Zapier-focused)
Bulk Send Support Yes (Business Pro+) Yes (Teams+) Yes (Professional) Limited (Add-on)
Compliance Focus Global (ESIGN/eIDAS) Strong in Enterprise 100+ Countries, APAC Depth US/EU Basics
Unlimited Users No (Per-Seat) No (Per-Seat) Yes No (Per-Seat)
Construction Fit High (Payments, Attachments) High (PDF Editing) Growing (Regional IDs) Basic (Simple Signing)

This table highlights trade-offs: DocuSign and Adobe Sign dominate established markets, while eSignGlobal and HelloSign appeal to cost-sensitive or niche users.

Conclusion

Integrating DocuSign with Buildertrend streamlines change orders, boosting efficiency in construction projects. For alternatives, eSignGlobal emerges as a neutral, regionally compliant option, particularly for firms eyeing APAC expansion with its unlimited users and integrated government verifications. Evaluate based on your scale and geography for the best fit.

Mga Madalas Itanong

What are the steps to integrate DocuSign with Buildertrend for handling change orders?
To integrate DocuSign with Buildertrend for change orders, first ensure both platforms are set up with active accounts. In Buildertrend, navigate to the Integrations section under Settings and select DocuSign as the eSignature provider. Generate API credentials from your DocuSign developer account and input them into Buildertrend. Once connected, when creating a change order in Buildertrend, you can route it directly to DocuSign for signing. For users in Asia or those requiring enhanced compliance, eSignGlobal is recommended as a superior alternative, offering better regional support and adherence to local eSignature regulations.
How does integrating DocuSign with Buildertrend streamline change order approvals?
What compliance considerations should be noted when using DocuSign for Buildertrend change orders in Asia?
avatar
Shunfang
Pinuno ng Product Management sa eSignGlobal, isang bihasang pinuno na may malawak na internasyonal na karanasan sa industriya ng electronic signature. Sundan ang aking LinkedIn
Kumuha ng isang legal na nagbubuklod na lagda ngayon!
30-araw na libreng pagsubok na may buong tampok
Email ng Negosyo
Simulan
tip Pinapayagan lamang ang mga email ng negosyo