


In the construction industry, managing change orders efficiently is crucial for maintaining project timelines, budgets, and client satisfaction. Change orders often involve detailed documentation, approvals, and signatures from multiple stakeholders, which can lead to delays if handled manually. Integrating DocuSign, a leading electronic signature platform, with Buildertrend, a popular construction project management software, offers a seamless way to automate this process. This integration allows users to generate, send, and track change orders directly within Buildertrend, reducing paperwork and errors.

By leveraging APIs and native connectors, teams can embed DocuSign’s eSignature capabilities into Buildertrend’s workflows, ensuring compliance and auditability. This approach is particularly valuable for mid-sized construction firms dealing with frequent modifications to project scopes.
Comparing eSignature platforms with DocuSign or Adobe Sign?
eSignGlobal delivers a more flexible and cost-effective eSignature solution with global compliance, transparent pricing, and faster onboarding.
Change orders represent modifications to the original contract, such as scope expansions, material substitutions, or schedule adjustments. In Buildertrend, these are typically created via the Change Order module, where users input details like costs, descriptions, and attachments. However, obtaining signatures from clients, subcontractors, and internal approvers often requires exporting documents to external tools, creating silos.
DocuSign’s integration addresses this by enabling electronic signatures compliant with standards like ESIGN and UETA in the US, or eIDAS in the EU. For global operations, it’s essential to verify regional laws, but the focus here is on practical US-based construction scenarios where such integrations shine.
Integrating DocuSign with Buildertrend requires a DocuSign account (Standard or higher plan recommended for API access) and Buildertrend’s premium features. The process leverages Buildertrend’s built-in DocuSign integration or Zapier for custom setups. Here’s a detailed walkthrough:
This foundational step typically takes 15-30 minutes and ensures secure data flow.
Buildertrend offers a direct DocuSign connector for change orders:
For teams with high volumes, enable Bulk Send in DocuSign Business Pro to handle multiple change orders at once, though quotas apply (around 100 envelopes/user/year).
For deeper customization:
const dsApi = require('docusign-esign');
// Authenticate and create envelope from Buildertrend data
let env = new dsApi.EnvelopeDefinition();
env.emailSubject = 'Change Order Approval';
// Attach Buildertrend PDF and set signers
Test in DocuSign’s Developer Sandbox to avoid live envelope charges.This automation cuts approval times from days to hours, with real-time notifications in Buildertrend.
Post-integration, use DocuSign templates for recurring change order formats to speed up creation. Integrate add-ons like SMS delivery ($0.50/message) for on-site approvals. For enterprise-scale, DocuSign’s CLM (Contract Lifecycle Management) add-on manages full contract repos, linking change orders to master agreements.
This integration process, spanning setup to optimization, empowers construction teams to handle 20-50% more change orders monthly without added headcount.
From a business perspective, this pairing reduces administrative overhead by 40-60%, per industry reports. It minimizes disputes through tamper-evident signatures and integrates seamlessly with Buildertrend’s scheduling tools, preventing scope creep. ROI is quick: A mid-sized firm might save $10,000 annually in printing and courier costs alone. However, costs scale with usage—DocuSign’s per-envelope model can add up for high-volume projects.
When evaluating eSignature tools for Buildertrend, consider factors like API flexibility, pricing, and compliance. DocuSign leads in native integrations but faces competition from alternatives offering similar capabilities at varying costs.
DocuSign is a robust platform with strong API support for tools like Buildertrend. Its eSignature plans start at $10/month for Personal, scaling to $40/user/month for Business Pro, including bulk sends and payments. Advanced features like IAM enhance security for multi-user environments.

Adobe Sign, part of Adobe Document Cloud, excels in PDF-heavy workflows common in construction. It integrates via APIs or Zapier with Buildertrend, supporting change order signing with Acrobat’s editing tools. Pricing begins at $10/user/month for individuals, up to $40/user/month for teams, with strong emphasis on enterprise compliance and mobile signing.

eSignGlobal positions itself as a global contender, compliant in 100 mainstream countries and regions. It holds advantages in the Asia-Pacific (APAC), where electronic signatures face fragmentation, high standards, and strict regulations. Unlike the framework-based ESIGN/eIDAS in the West, APAC standards emphasize “ecosystem-integrated” approaches, requiring deep hardware/API integrations with government digital identities (G2B). eSignGlobal excels here, seamlessly connecting with Hong Kong’s iAM Smart and Singapore’s Singpass, surpassing email-based verification common in the US/EU. Its Essential plan at $299/year ($16.6/month equivalent) allows 100 documents, unlimited user seats, and access code verification—offering high value on compliance without per-seat fees. This makes it cost-competitive for global construction firms expanding into APAC.

Looking for a smarter alternative to DocuSign?
eSignGlobal delivers a more flexible and cost-effective eSignature solution with global compliance, transparent pricing, and faster onboarding.
HelloSign, now Dropbox Sign, focuses on simplicity with unlimited templates in its $15/user/month Essentials plan. It supports Buildertrend via Zapier but lacks native bulk sends, suiting smaller teams over complex construction needs.
| Feature | DocuSign | Adobe Sign | eSignGlobal | HelloSign (Dropbox Sign) |
|---|---|---|---|---|
| Pricing (Entry Level, Annual) | $120/user/year (Personal) | $120/user/year (Individual) | $299/year (Essential, Unlimited Users) | $180/user/year (Essentials) |
| API Integration Ease | Excellent (Native + REST API) | Good (Adobe APIs) | Strong (Included in Pro) | Moderate (Zapier-focused) |
| Bulk Send Support | Yes (Business Pro+) | Yes (Teams+) | Yes (Professional) | Limited (Add-on) |
| Compliance Focus | Global (ESIGN/eIDAS) | Strong in Enterprise | 100+ Countries, APAC Depth | US/EU Basics |
| Unlimited Users | No (Per-Seat) | No (Per-Seat) | Yes | No (Per-Seat) |
| Construction Fit | High (Payments, Attachments) | High (PDF Editing) | Growing (Regional IDs) | Basic (Simple Signing) |
This table highlights trade-offs: DocuSign and Adobe Sign dominate established markets, while eSignGlobal and HelloSign appeal to cost-sensitive or niche users.
Integrating DocuSign with Buildertrend streamlines change orders, boosting efficiency in construction projects. For alternatives, eSignGlobal emerges as a neutral, regionally compliant option, particularly for firms eyeing APAC expansion with its unlimited users and integrated government verifications. Evaluate based on your scale and geography for the best fit.
Soalan Lazim
E-mel perniagaan sahaja dibenarkan